VE Wasser 2012 Vorlage eng

Project Background

The power plant operator was forced to look for an alternative water source due to the imminent withdrawal of the water law permit regarding the extraction of well water. The possibility of being able to use river water for deionised water treatment for the steam generator with the use of a plant from OSMO Membrane Systems GmbH secured the location of the power plant. 

  VE Wasser 2012 Beitragsbilder

Objective & Challenge

The aim was to achieve maximum supply security despite highly fluctuating river water qualities. 

  

Concept and implementation

The process combination of ultrafiltration in the out/in process and reverse osmosis was designed redundantly for this reason.

 

Customer benefits

  • High security of supply due to redundant plant design
  • Relief of the existing DI water plant through upstream desalination by RO
  • Savings in operating costs due to high degree of automation
 

Facts and figures

commissioning:   2012
plant capacity: 130 m³/h
feed medium:   river water

 

Processes:

Icon Ultrafiltration FINAL Icon Umkehrosmose FINAL      
  ultrafiltration  reverse osmosis